JWC
SOLUTIONS
Our story

Know what’s true. Operate with excellence.

JWC Solutions helps oil and gas and chemical facilities across Canada know which engineering record is current, and that the plant still matches it. We call this design-basis integrity. It’s the engineering information that Process Safety Management (PSM) and broader operational excellence depend on.

01 · The question

The question has changed

“Show me the drawing” used to be enough. It isn’t anymore.

Regulators, auditors and CSA Z767:24, Canada’s 2024 Process Safety Management standard, now expect more. The strongest operators aren’t waiting for an audit to ask.

Then“Show me the drawing.”
Now, show that records are
  • Current
  • Controlled and traceable
  • In agreement with each other
  • Matched by the plant
02 · Why it’s hard

Why it’s hard, even for well-run facilities

Projects, maintenance and MOC change the record one document at a time. Over the years, the P&IDs, Instrument Setpoint List and Shutdown Key drift apart, and the control system drifts from all three.

The values that matter most, the setpoints, alarms and trips, stay locked inside documents. So engineers reconcile by hand, or build in-house tools that fall out of date. Then the next change starts the drift again.

CHANGECHANGECHANGE P&ID Setpoint List Shutdown Key Control system Issued, in agreement Years of change →
Illustrative.
03 · What’s at stake

What’s at stake

In the audit room

Your credibility is on the line.

An engineering director sits across from an auditor, trying to prove something they believe is true.

On site

Is the interlock active, and at what setpoint?

The Shutdown Key shows an interlock. The setpoint list has no value for it. Before the job goes ahead, someone has to work out which record is right.

Layered reviews usually catch these differences. Still, the records in front of you should be ones you can trust.

04 · Where we come from

Where we come from

I spent two decades as a process engineer in Canadian oil and gas. At every company I worked for, I spent a significant amount of time working out which revision was the right one to use.

  1. Two decadesProcess engineer in Canadian oil and gas
  2. More than onceBuilt tools that worked, until nobody had time to maintain them
  3. About ten yearsLooked for a platform that did this properly. Found only pieces
  4. Late 2025Saw the same struggle at two large, well-run organizations
  5. 2026Started building the platform I’d been looking for

If it happens at well-run companies, it isn’t a people problem. And producers are in the business of producing oil and gas, not building software.

Jamie W. Clarke, P.Eng., Founder & CEO

05 · What we believe

Sound engineering decisions start with knowing what’s true.

Keep the document’s discipline. Free the data inside it.

Records need the control and revision history that make them authoritative. A separate database just adds a second record to keep current.

Facilities shouldn’t have to build software.

You need a tool you can depend on, not another in-house build to maintain.

06 · What we’re building

Know which record is current. Know the plant matches.

cedX (Controlled Engineering Document exchange) is our design-basis integrity platform. We’re building it in-house, with Jason Abdi, VP of Technology, leading development. cedX is designed to work alongside the document control, MOC and control systems you already use.

The cedX platform has two offerings: a foundation that works on its own, and an optional add-on that builds on it.

cedX Core Platform

The foundation
What it answers
cedX Core answers the first question: which record is current? It is designed to establish one Authoritative revision per scope, with its revision lineage, and to identify where records disagree.
Boundary
Boundary. cedX uses AI to read engineering documents and draft the data. Nothing is published until an engineer reviews and approves it.

cedX Control System Integrity Verify (cedX CSIV)

The add-on
What it answers
cedX CSIV answers the second question: does the plant match? Added to cedX Core, it is designed to compare control-system values with the Authoritative record, read-only, and to report Coverage Rate and Alignment Rate together.
Requires
Requires cedX Core. cedX Core does not require cedX CSIV.

Our Operational Excellence Engineering Advisory practice adds senior engineering capacity inside your team for facilities using or adopting cedX. We help design your pilot, support adoption, and strengthen the workflows around your engineering records. Your team keeps ownership of its decisions and programs.

07 · When it works

What it looks like when it works

The future cedX is being built to support.

At the next audit

Show the trail. Don’t rebuild it.

Differences were found, reviewed, prioritized and closed through MOC, and the auditor can follow that trail.

At the next job plan

Know which record is current.

An engineer can see whether the interlock on the P&ID is also in the setpoint list, the Shutdown Key and the plant.

With leadership

Make the case from your own data.

No in-house tool to build or maintain, and a business case built on your facility’s numbers.

Start with a pilot

Your numbers, measured first.

We don’t ask you to take our word for it. A paid pilot runs one to three months on a defined scope of your own records. We measure your baseline, apply cedX, and compare the results. The business case comes from your data, not ours.

If you’ve built one of these tools yourself, you already know the problem. Bring what you’ve built, and cedX is designed to carry it forward. If an audit is on the horizon, now is a good time to talk.